Thermal Plant Upgrade
The thermal plant system upgrade involved the reconfiguration and reuse of existing chillers and installation of one new chiller to provide 100% system redundancy. These works needed to be staged such that one system was always operational throughout the project. It was essential that the operation of the existing air conditioning systems was not disrupted during the new upgrade works while the museum was hosting local and travelling exhibitions.
Comments