top of page


Sam Kuhn
Dec 4, 20231 min read
Dawson Street Cold Stores – Project in Progress
A new cold store is being erected at East Arm, that has a large 1300 m2 refrigerated space consisting of chillers, freezers and ante...
48 views0 comments


Sam Kuhn
Dec 3, 20231 min read
Oriental Emporium - Completed
The rebuild of the Oriental Emporium consisted of FRM's refrigeration, HVAC and electrical teams which included the complete supply and...
27 views0 comments

Sam Kuhn
Dec 2, 20231 min read
Palmerston Golf and Country Club – Completed
Redevelopment of the Palmerston golf and country club was completed over two stages and included an international standard 18 hole mini...
30 views0 comments


Sam Kuhn
Dec 1, 20231 min read
Officers Mess Robertson Barracks
Works carried out for this project were mechanical, electrical & BMS upgrades to Robertson Barracks Officers mess. We supplied 2kw Trane...
30 views0 comments


Sam Kuhn
Nov 30, 20231 min read
Rombola Melon Farm
We installed cooling systems in different rooms: 3 rooms at 4 degrees Celsius, each 121 square meters, totaling 363 square meters. 1...
17 views0 comments

Sam Kuhn
Nov 29, 20231 min read
Repco Palmerston
This new build included both the design, supply and installation of the complete air conditioning system for the building. The electrical...
10 views0 comments
Sam Kuhn
Nov 8, 20231 min read
Sergeants Mess HVAC Rectification
Supply and stall one air-cooled system comprising of three 100% outdoor air pre-conditioning indoor ducted units complete with drain...
3 views0 comments
Sam Kuhn
Nov 8, 20231 min read
Target Tenancy HVAC Upgrade
Supply and install of two air cooled 600kW chillers, two new chilled water pumps, 2000L buffer tank and 6 new chilled water-cooling coils.
2 views0 comments
Sam Kuhn
Nov 8, 20231 min read
MAGNET
Installation of a new 790kW chiller and a new stainless-steel plate heat exchanger to serve the new chiller
3 views0 comments


Sam Kuhn
Nov 8, 20231 min read
Wyuna Cold stores – Completed
Developed a new cold stores facility on Osgood Drive in Eaton. Holds the capacity of 1200 pallet spaces in the chilled storage area, 1000...
1 view0 comments


Sam Kuhn
Feb 21, 20231 min read
AMF King Pin Bowling Refrigeration
Client: AMF Bowling Contract Name: AMF King pin Bowling Site Location: Millner Year: 2015 Scope of Work: Supply and install new Keg cool...
3 views0 comments


Sam Kuhn
Feb 21, 20231 min read
Woolworths Bakewell New Store
Client: Woolworths Contract Name: Woolworths Bakewell Site Location: Bakewell Shopping Centre Year: 2015/2016 Scope of Work: Supply and...
3 views0 comments


Sam Kuhn
Feb 21, 20231 min read
State Square Underground Carpark
Mechanical and Ventilation Installation This underground carpark the largest in the NT & completely under the ground level on the steps...
4 views0 comments


Sam Kuhn
Feb 21, 20231 min read
Tindal Fire Station
Mechanical Upgrade The Mechanical Services installation at the Fire Station at RAAF Base Tindal located near Katherine involved the...
1 view0 comments


Sam Kuhn
Feb 21, 20231 min read
Nightcliff Renal Unit
Mechanical Upgrade The Nightcliff Renal Unit project was a complete upgrade and spatial rearrangement of existing facilities. The works...
4 views0 comments

Sam Kuhn
Feb 21, 20231 min read
Darwin Entertainment Centre
Thermal Plant Upgrade The Darwin Performing Arts Centre was commissioned in the eraly eighties with the majority of the original...
2 views0 comments


Sam Kuhn
Feb 21, 20231 min read
Darwin Museum and Art Gallery
Thermal Plant Upgrade The thermal plant system upgrade involved the reconfiguration and reuse of existing chillers and installation of...
1 view0 comments
bottom of page